Construction Waste

During construction, more than 50% of construction waste was diverted from disposal in landfills. Recyclable resources were redirected back to the manufacturing process.

A waste management plan was implemented that identified the materials to be diverted from landfills and how materials would be sorted on-site.

 

Close

Places I've Been

The following links are virtual breadcrumbs marking the 27 most recent pages you have visited in Bucknell.edu. If you want to remember a specific page forever click the pin in the top right corner and we will be sure not to replace it. Close this message.