Smith Hall

This three phased project includes the replacement of the entire HVAC system in the building as well as the construction of large dormer units at the attic level.  The first phase focuses on the construction of the attic dormers and the new air handling system while the second and third phases focus on installation of fan coil units and piping within each of the student rooms.  The new energy efficient system will provide better heating, cooling, and dehumidification control within the building.

Exterior and Interior

Close

Places I've Been

The following links are virtual breadcrumbs marking the 27 most recent pages you have visited in Bucknell.edu. If you want to remember a specific page forever click the pin in the top right corner and we will be sure not to replace it. Close this message.