Construction Waste

During construction, more than 90% of construction waste was diverted from disposal in landfills. Recyclable resources were redirected back to the manufacturing process.

A construction waste plan formulated prior to construction identified waste items which would be separated and diverted from landfills or recycled. Such items included wood, asphalt, concrete, brick, metals, cardboard, paper, and drywall. Designated dumpsters for these items were labeled and monitored during construction.

Close

Places I've Been

The following links are virtual breadcrumbs marking the 27 most recent pages you have visited in Bucknell.edu. If you want to remember a specific page forever click the pin in the top right corner and we will be sure not to replace it. Close this message.